New Inlet Boat Ramp Pea Island and Parking Lot Closed to Public for Bridge Construction Project

The New Inlet Boat Ramp Pea Island and parking lot will be closed to the public starting today. As part of the new permanent bridge construction on Highway 12 on Hatteras Island at Pea Island the NCDOT will close to the public the New Inlet Boat ramp and parking lot. The NCDOT will use the area as a staging location for equipment and materials during the new bridge construction project. The closing to the public begin today Tuesday 3/18/2014.

Pea Island Temporary Bridge on Hatteras Island

 

Location of Bridge Construction and Closure of New Inlet Pea Island Boat Ramp and Parking Lot

 

 

 

Share