Wright Memorial Bridge Work Starts Today at Outer Banks

Work begins today on the westbound U.S. 158 Wright  Bridge over the Currituck Sound at the Currituck and Dare county line. The NCDOT will close the westbound bridge for work. The eastbound side of the bridge will be two-lanes with a two-way pattern. Work on the bridge will continue until May of 2014. Drivers are advised to pay close attention while in the area and look for signs with construction information. Drivers also need to expect delays.

Share